Frekil Logo
Post-Approval Evidence

Post-approval evidence.

Approval is not the last evidence a medicine needs. After it, regulators ask for safety studies, HTA bodies and payers ask how it compares with current care, and the label can grow to new populations. Most of these are observational studies on real-world data: EHR, claims and registries. This guide covers who asks for what, which study answers it, and the standards those studies are held to.

See all RWE study types

Who asks for post-approval evidence, and what they ask for

Regulators, HTA bodies and payers each have their own route. The studies behind them often overlap.

FDA

Postmarketing requirements (PMRs) and commitments (PMCs)

Under section 505(o)(3) of the FD&C Act, added in 2007, FDA can require studies to assess a known or signaled serious risk, or to find an unexpected one. A PMR is required by law; a PMC is a study the sponsor agrees to run. Before requiring a postmarketing clinical trial, FDA must find that a postmarketing study would not be enough.

FDA, Postmarketing Studies and Clinical Trials: Implementation of Section 505(o)(3) (final, 2011)

EMA and PRAC

Post-authorisation safety studies (PASS)

A PASS can be imposed as a condition of the marketing authorization (categories 1 and 2 in the risk management plan) or required in the risk management plan to investigate a safety concern or measure how well risk minimization works (category 3). Companies can also run a PASS voluntarily. PRAC reviews the protocol and results of imposed non-interventional PASS. Studies are registered in the HMA-EMA Catalogue of Real-World Data Studies, which replaced the EU PAS Register.

EMA, GVP Module VIII: Post-authorisation safety studies (Rev 3)

ICH M14: the shared standard for safety studies

ICH M14 sets general principles for planning, designing, analyzing and reporting non-interventional studies that use real-world data to assess the safety of medicines. ICH adopted it on 4 September 2025, and it came into effect in the EU on 18 March 2026.

It asks for an iterative approach: check that the data are fit for use, assess feasibility, and refine the design from what the feasibility work shows, before the study runs. EMA notes that its key principles may also apply to effectiveness studies.

Read ICH M14 (Step 4 final version)

What makes post-approval studies hard

The protocol is reviewed before any data

An imposed PASS protocol goes to PRAC, and HTA bodies read the design before the result. Design choices have to be fixed, justified and written down first.

The data have to be fit for the question

ICH M14 asks for a feasibility assessment and a check that the data can answer the question before the design is final.

Bias has to be designed out, not adjusted later

Confounding by indication, immortal time and prevalent-user bias are handled in the design: new users, active comparators and a clear time zero.

Every number has to be traceable

Reviewers ask where each estimate came from. The analysis code, the code lists and every change to the plan need a record.

The biases and designs are covered in more depth in types of real-world evidence studies.

How Frekil runs post-approval studies

Frekil runs observational post-approval studies on the EHR, claims and registry data you license or own, inside your environment. The protocol follows the HARPER template, or yours, and the protocol and analysis plan are locked before the data are touched.

Confounders come from a causal graph whose edges cite the literature. Negative and positive control outcomes and sensitivity analyses test the result. The AI writes the code, never the result, and your team signs off each stage, with every change recorded. The final report comes with a reporting checklist mapped to STROBE, RECORD, RECORD-PE, TARGET, ICH M14 and the EMA final study report.

Frekil does not run interventional trials, sites or recruitment. See post-market safety, HEOR and market access and label expansion.

Common Questions

Clear answers.

The evidence a medicine needs after it is approved: safety studies regulators require or request, effectiveness evidence, comparisons with current care for HTA bodies and payers, and evidence to extend the label to new populations. Most of it comes from observational studies on real-world data such as EHR, claims and registries.

A postmarketing requirement (PMR) is a study or trial FDA requires by law: for example under section 505(o)(3) of the FD&C Act to assess a known or signaled serious risk, as a confirmatory trial after accelerated approval, or as a deferred pediatric study under PREA. A postmarketing commitment (PMC) is a study the sponsor agrees to run that is not required by statute. Before requiring a postmarketing clinical trial, FDA must find that a postmarketing study would not be enough.

A study run after a medicine is authorized in the EU to identify, characterize or quantify a safety hazard, confirm its safety profile, or measure how well risk minimization works. A PASS can be imposed as a condition of the marketing authorization, required in the risk management plan, or run voluntarily. PRAC reviews the protocols and results of imposed non-interventional PASS, and studies are registered in the HMA-EMA Catalogue of Real-World Data Studies.

ICH M14 is the harmonized guideline on planning, designing, analyzing and reporting non-interventional studies that use real-world data to assess the safety of medicines. ICH adopted it on 4 September 2025, and it came into effect in the EU on 18 March 2026. It asks for data fitness-for-use and feasibility to be assessed before the design is finalized.

Under Regulation (EU) 2021/2282, joint clinical assessments apply to new cancer medicines and advanced therapy medicinal products from 12 January 2025, to orphan medicines from 13 January 2028, and to other centrally authorized medicines from 13 January 2030.

No. Frekil runs observational (non-interventional) studies on data you license or own. It does not run interventional trials, sites or patient recruitment. Many post-approval commitments, such as non-interventional PASS, comparative effectiveness and external comparator studies, are observational, and those are the studies Frekil is built for.

Frekil runs observational post-approval studies, such as non-interventional PASS, comparative effectiveness, drug utilization, external comparator and HEOR studies, on EHR, claims and registry data you license or own. The protocol and analysis plan are locked before the data are touched, and your experts sign off each stage. Frekil does not run interventional trials, sites or recruitment.

Run your next post-approval study on your own data.

Protocol, cohort, analysis and report, with your experts signing off each stage.

Last updated

Get started

Try Frekil

ISPOR Europe 2026
Meet us in Vienna

Frekil will be at ISPOR Europe 2026

When
8–11 November 2026
Where
Austria Center Vienna

If you're at ISPOR Europe, book 30 minutes with the Frekil team to see how Frekil generates end-to-end RWE.